20–21 NOVEMBER 2026 · CENTRAL STANDARD TIME
Imaging results
80.3%of planned raw integration
5h 42m171 × 120s captured
3h 50mverified Keep added
171 / 171NAS verified and measured
Plan completion and project progress
| Target | Frames | Raw | Planned | Plan captured | Keep added | Verified goal progress |
|---|---|---|---|---|---|---|
| NGC 7822 — SHO | 108 | 3h 36m | 2h 50m | 127.1% | 2h 02m | 85.5% → 94.7% |
| NGC 2264 — Cone and Christmas Tree | 63 | 2h 06m | 4h 16m | 49.2% | 1h 48m | 29.4% → 40.6% |
Goal progress is cumulative measured Keep divided by the saved filter goals. After manual review of NGC 7822, 14 frames at 4.00–4.10 px FWHM moved to Keep and 45 moved to Reject. This run added 115 Keep frames overall, with 8 in Review and 48 rated Reject.
Progress by filter
NGC 7822 — SHO
| Filter | Raw captured | Keep added | Total Keep | Goal | Goal progress |
|---|---|---|---|---|---|
| SII | 2h 12m | 1h 12m | 7h 40m | 8h 00m | 80.8% → 95.8% |
| OIII | 0m | 0m | 7h 20m | 8h 00m | 91.7% → 91.7% |
| Ha | 1h 24m | 50m | 5h 50m | 6h 00m | 83.3% → 97.2% |
NGC 2264 — Cone and Christmas Tree
| Filter | Raw captured | Keep added | Total Keep | Goal | Goal progress |
|---|---|---|---|---|---|
| SII | 48m | 38m | 2h 28m | 6h 00m | 30.6% → 41.1% |
| OIII | 48m | 42m | 2h 26m | 6h 00m | 28.9% → 40.6% |
| Ha | 30m | 28m | 1h 36m | 4h 00m | 28.3% → 40.0% |
Run notes
The final NGC 2264 exposure started at 1:56 a.m. CST. At 5:46:30 a.m., N.I.N.A. was still waiting for safe conditions. Wait Until Safe or Deadline skipped recovery and handed off to shutdown. The cause of the safety interruption was unconfirmed.
N.I.N.A. logged the cooler turning off and the sequence finishing at 5:50 a.m. CST.