20–21 NOVEMBER 2026 · CENTRAL STANDARD TIME
November 20 imaging plan
Results available. The run captured 80.3% of the plan. View actuals and project progress.
Planned fields
Survey previews show the planned framing.
The night at a glance
NGC 7822 runs through 23:30 CST. NGC 2264 then takes over and images through astronomical dawn.
Moon separation throughout the night
The waxing gibbous Moon is 83.5% illuminated and 51.0° high at dusk. It sets at about 03:49 CST, about an hour later than November 19–20. NGC 7822 is scheduled for SII and Ha because OIII misses its modeled separation threshold. NGC 2264 clears the limits for all three filters.
Per-filter progress & planned contribution
Solid bars show measured Keep credit; pending captures and the planned exposure remain separate. An acquisition goal being filled does not automatically approve frames or complete processing.
Proposed sequence outline
Proposed timed handoffs and repeating filter batches.
- Use the established startup, safe-roof wait and cooling steps.
Proposed safety recovery. Wait Until Safe or Deadline will let recovery run only if the safety monitor reports Safe before 05:46:30 CST. If the cutoff arrives while conditions are Unsafe, the sequence should skip recovery and run End of Session Shutdown. The same cutoff bounds the imaging group.
After the final visit, use the established home and warming steps, then Disconnect Other Equipment to keep building 7 roof monitoring connected.
Plan evidence & assumptions
Estimated overhead includes five minutes of acquisition per visit, eight seconds of readout per frame, one minute per filter change, ten percent routine overhead and ten minutes for each modeled meridian flip.