23–24 NOVEMBER 2026 · CENTRAL STANDARD TIME
November 23 imaging plan
Results available. The run captured 18.0% of the plan. View actuals and project progress.
Planned fields
Survey previews show the planned framing. The Dumbbell and Soul Nebula images are reference images.
The night at a glance
M27 opens at dusk, followed by IC 1396 and the Soul Nebula. NGC 2264 has a short top-up before Rosette takes over at 02:45 CST.
Moon separation throughout the night
The waxing gibbous Moon is 99.3% illuminated and 26.5° high at dusk. It sets at about 07:19 CST, about 90 minutes after astronomical dawn. M27 clears the modeled OIII limit early. The other visits use Hα and SII where the Moon separation permits.
Per-filter progress & planned contribution
Solid bars show measured Keep credit; pending captures and the planned exposure remain separate. An acquisition goal being filled does not automatically approve frames or complete processing.
Proposed sequence outline
Proposed timed handoffs and repeating filter batches.
- Use the established startup, safe-roof wait and cooling steps.
Proposed safety recovery. Wait Until Safe or Deadline will let recovery run only if the safety monitor reports Safe before 05:48:42 CST. If the cutoff arrives while conditions are Unsafe, the sequence should skip recovery and run End of Session Shutdown. The same cutoff bounds the imaging group.
After the final visit, use the established home and warming steps, then Disconnect Other Equipment to keep building 7 roof monitoring connected.
Plan evidence & assumptions
Estimated overhead includes five minutes of acquisition per visit, eight seconds of readout per frame, one minute per filter change, ten percent routine overhead and ten minutes for each modeled meridian flip.