19–20 NOVEMBER 2026 · CENTRAL STANDARD TIME
Imaging results
86.3%of planned raw integration
6h 04m182 × 120s captured
5h 36mverified Keep added
182 / 182NAS verified, measured and solved
Plan completion and project progress
| Target | Frames | Raw | Planned | Plan captured | Keep added | Verified goal progress |
|---|---|---|---|---|---|---|
| NGC 7822 — SHO | 122 | 4h 04m | 3h 18m | 123.2% | 3h 40m | 68.8% → 85.5% |
| NGC 2264 — Cone and Christmas Tree | 60 | 2h 00m | 3h 44m | 53.6% | 1h 56m | 17.3% → 29.4% |
Goal progress is cumulative measured Keep divided by the saved filter goals. Starting totals include the recovered frames from earlier nights. This run added 168 Keep frames, with 14 in Review and zero Rejects.
Progress by filter
NGC 7822 — SHO
| Filter | Raw captured | Keep added | Total Keep | Goal | Goal progress |
|---|---|---|---|---|---|
| SII | 1h 22m | 1h 10m | 6h 28m | 8h 00m | 66.2% → 80.8% |
| OIII | 1h 24m | 1h 20m | 7h 20m | 8h 00m | 75.0% → 91.7% |
| Ha | 1h 18m | 1h 10m | 5h 00m | 6h 00m | 63.9% → 83.3% |
NGC 2264 — Cone and Christmas Tree
| Filter | Raw captured | Keep added | Total Keep | Goal | Goal progress |
|---|---|---|---|---|---|
| SII | 48m | 44m | 1h 50m | 6h 00m | 18.3% → 30.6% |
| OIII | 44m | 44m | 1h 44m | 6h 00m | 16.7% → 28.9% |
| Ha | 28m | 28m | 1h 08m | 4h 00m | 16.7% → 28.3% |
Run notes
During NGC 2264, N.I.N.A. reported Unsafe from 1:14 to 3:38 a.m. CST and again at 4:44 a.m. The last saved exposure started at 4:41 a.m. A brief return to Safe at 5:22 a.m. ended during autofocus.
Shutdown completed at 6:28 a.m. with the mount home, tracking and cooling off, and the safety monitor connected.