18–19 NOVEMBER 2026 · CENTRAL STANDARD TIME
Imaging results
Plan completion and project progress
| Target | Frames | Raw | Planned | Plan captured | Keep added | Verified goal progress | Goal if pending frames are kept |
|---|---|---|---|---|---|---|---|
| NGC 7822 — SHO | 178 | 5h 56m | 4h 46m | 124.5% | 0m | 48.6% → 48.6% | 75.6% |
| M 31 A | 24 | 48m | 30m | 160.0% | 0m | 7.3% → 7.3% | 23.3% |
| NGC 2264 — Cone and Christmas Tree | 19 | 38m | 1h 36m | 39.6% | 0m | 0.0% → 0.0% | 4.0% |
Project goal percentages use the sum of measured Keep time divided by the sum of saved filter goals. The starting point is the November 18 pre-run inventory. The ending point includes only this night’s Keep frames verified by 7:54 AM CST. Verified totals are provisional while transfer and review are pending. The last column shows the maximum if all pending or Review frames from this night are kept.
0 Keep · 0 Review · 0 Reject · 221 pending rating or transfer.
Progress by filter
NGC 7822 — SHO
| Filter | Raw captured | Keep added | Total Keep | Goal | Goal progress |
|---|---|---|---|---|---|
| Ha | 1h 36m | 0m | 2h 40m | 6h 00m | 44.4% → 44.4% |
| OIII | 2h 08m | 0m | 4h 12m | 8h 00m | 52.5% → 52.5% |
| SII | 2h 12m | 0m | 3h 50m | 8h 00m | 47.9% → 47.9% |
M 31 A
| Filter | Raw captured | Keep added | Total Keep | Goal | Goal progress |
|---|---|---|---|---|---|
| B | 8m | 0m | 3m | 1h 00m | 5.0% → 5.0% |
| G | 10m | 0m | 3m | 1h 00m | 5.0% → 5.0% |
| L | 20m | 0m | 12m | 2h 00m | 10.0% → 10.0% |
| R | 10m | 0m | 4m | 1h 00m | 6.7% → 6.7% |
NGC 2264 — Cone and Christmas Tree
| Filter | Raw captured | Keep added | Total Keep | Goal | Goal progress |
|---|---|---|---|---|---|
| Ha | 8m | 0m | 0m | 4h 00m | 0.0% → 0.0% |
| OIII | 12m | 0m | 0m | 6h 00m | 0.0% → 0.0% |
| SII | 18m | 0m | 0m | 6h 00m | 0.0% → 0.0% |
Run notes
Building 7 recorded the roof closure at 3:50:21 a.m. during NGC 2264. N.I.N.A. went Unsafe at 3:52:17 a.m. PHD2 logged 13 settling timeouts.
Shutdown finished at 7:52 a.m. The mount reached home, the cooler switched off, and N.I.N.A. disconnected the six imaging devices.