Project goal percentages use the sum of measured Keep time divided by the sum of saved filter goals. The starting point is the November 17 pre-run inventory. The ending point includes only this night’s Keep frames verified by 7:19 AM CST. Ratings and goal progress are provisional while transfer and review continue.
N.I.N.A. went Unsafe at 9:56 p.m. during NGC 7822 and returned Safe at 11:46 p.m. Building 7 recorded the final roof closure at 5:40:35 a.m., shortly before dawn. The guider logged nine settling timeouts and had trouble reacquiring a star late in M31 D.
Shutdown finished at 7:17 a.m. The mount reached home, the cooler switched off, and N.I.N.A. disconnected the six imaging devices.