November 16 imaging plan
Roof closed all night due to humidity. No imaging captured. IC 1396 — whole complex → NGC 7822 — SHO → M 31 D → M 31 A → NGC 2264. Planned science exposure 6h 52m.
Actual outcome
Humidity kept the roof closed all night. I checked the N.I.N.A. computer and found 0 frames and 0 minutes of integration.
Planned fields
Survey previews show framing context. The full Andromeda mosaic is shown for panels D and A.
The night at a glance
M31 D begins after moonset. At 03:03 CST, NGC 2264 takes over from M31 A and images until astronomical dawn.
Moon separation throughout the night
The waxing crescent is 45.8% illuminated at dusk. It sets at about 23:53 CST. NGC 7822 continues in narrowband until the first broadband visit at 23:54 CST.
Per-filter progress & planned contribution
Solid bars show measured Keep credit; pending captures and the planned exposure remain separate. An acquisition goal being filled does not automatically approve frames or complete processing.
Loaded sequence outline
The sequence was loaded in N.I.N.A. N.I.N.A. was idle when I checked in the morning.
- Use the established startup, safe-roof wait and cooling steps.
After the final visit, use the established home and warming steps, then Disconnect Other Equipment to keep building 7 roof monitoring connected.
Plan evidence & assumptions
Estimated overhead includes five minutes of acquisition per visit, eight seconds of readout per frame, one minute per filter change, ten percent routine overhead and ten minutes for each modeled meridian flip.