5–6 NOVEMBER 2026 · CENTRAL STANDARD TIME
Four fields.
Two-minute exposures.
Saved plan · actual results available. Veil F → M31 F → M31 B → Rosette. Continue 120-second exposures in every filter. Conservative complete-cycle estimate: 6h 50m; final partial cycles can add frames.
Tonight’s fields
Survey previews, not captured images. M31 B/F and Veil F retain their saved mosaic compositions. Rosette uses the project framing captured on November 3; preserve it when constructing a later native sequence.
The night at a glance
Fixed handoffs, repeating filter cycles. Veil F — South 19:08–21:08, M 31 F 21:08–23:28, M 31 B 23:28–01:48, Rosette Nebula — SHO 01:48–05:35 CST. Windows include acquisition and overhead. Counts are estimates, with no outer cycle cap.
Moon separation throughout the night
The waning crescent Moon is about 10% illuminated at dusk and rises near 04:31 CST. Both M31 visits finish before moonrise. Veil F and Rosette meet the saved narrowband Moon rules, including OIII.
Per-filter progress & tonight’s contribution
Solid bars show measured Keep credit; pending captures and tonight’s estimated exposure remain separate. An acquisition goal being filled does not automatically approve frames or complete processing.
Saved sequence outline
Archived plan. The November 5 sequence was loaded for review; its subsequent capture and early Rosette interruption are documented on the actual-results page.
- Established startup: connect the configured devices, home the mount, wait until safe, then cool using the focuser-temperature proxy. Publishing this proposal does not control equipment.
After Rosette: use the established stop, home and warming steps, then Disconnect Other Equipment, leaving building 7 roof monitoring connected. No Discord or Ground Station instructions; notifications use Starfront’s native implementation.
Plan evidence & assumptions
Exposure estimates use the earlier overhead budget: five-minute acquisition per field, one-minute filter changes, readout, routine overhead and flip allowances. Counts were rounded to complete 120-second cycles without re-optimizing overhead. The proposed loops repeat until the fixed handoff; they have no outer cycle cap.