Skip to content✧ STARFRONTDashboard ↗
Antique armillary sphere engraving
STARFRONT

The Observing Ledger

Imaging nights │ Starfront Observatory · Texas │ CST

CLEAR SKIES
DEEPER QUESTIONS
A BRIGHTER TOMORROW

3–4 NOVEMBER 2026 · CENTRAL STANDARD TIME

Four fields.
Two-minute exposures.

Loaded in N.I.N.A. · stopped for review. Veil F → M31 F → M31 B → Rosette. About 7 hours of estimated exposure across the full astronomical night, using 120-second images in every filter.

Tonight’s fields

Survey previews, not captured images. M31 B/F and Veil F retain their saved mosaic compositions. Rosette’s proposed project center still needs framing confirmation before N.I.N.A. handoff.

The night at a glance

19:10 · astronomical dusk05:34 · astronomical dawn

Fixed handoffs, repeating filter cycles. The proposed windows are 19:10–21:10 Veil F, 21:10–23:30 M31 F, 23:30–01:50 M31 B, and 01:50–05:34 Rosette, all CST. Windows include acquisition and overhead; frame counts are estimates rather than runtime caps.

Moon separation throughout the night

The Moon is about 27% illuminated at dusk and rises near 02:28 CST in the planning model. Both M31 visits finish before moonrise. Veil F and Rosette include OIII tonight under the saved filter-specific Moon rules. Explore separation and eligibility below.

Per-filter progress & tonight’s contribution

Solid bars show measured Keep credit; pending captures and tonight’s estimated exposure remain separate. An acquisition goal being filled does not automatically approve frames or complete processing.

Sequence loaded for review

2026-11-03.json · stopped. All four targets, 14 filter batches, framing, deadlines and recovery/shutdown were verified through native readback. The dashboard projects only the first 256 nodes; the complete sequence is loaded in N.I.N.A. Equipment connections are unchanged.

  1. Established startup: connect the configured devices, home the mount, wait until safe, then cool using the focuser-temperature proxy. Publishing this proposal does not control equipment.

    After Rosette: use the established stop, home and warming steps, then Disconnect Other Equipment, leaving building 7 roof monitoring connected. No Discord or Ground Station instructions; notifications use Starfront’s native implementation.

    Plan evidence & assumptions

      Exposure estimates use the earlier overhead budget: five-minute acquisition per field, one-minute filter changes, readout, routine overhead and flip allowances. Counts were rounded to complete 120-second cycles without re-optimizing overhead. The proposed loops repeat until the fixed handoff; they have no outer cycle cap.

      Proposal data · One-minute Moon geometry