Skip to content✧ STARFRONTDashboard ↗
Antique armillary sphere engraving
STARFRONT

The Observing Ledger

Imaging nights │ Starfront Observatory · Texas │ CDT

CLEAR SKIES
DEEPER QUESTIONS
A BRIGHTER TOMORROW

21–22 OCTOBER 2026 · CDT

Follow the Moon.
Finish with Orion.

Website review plan only · N.I.N.A. unchanged. Hα and SII on Veil F first, M31’s F and B fields after moonset, then Orion HDR production and deep LRGB. No further Orion test exposures. The proposed counts include estimated overhead and depend on roof opening, weather and equipment readiness. About 3h 48m of deep exposure is estimated if all four windows run; short highlights are additional.

Before this plan can run

Guiding and Orion acquisition need attention. Last night recorded 99 settling timeouts and repeated ASCOM pulse-guide warnings. Orion reached its centering plate solve but saved no science files. Those issues are not resolved by creating this plan; verify guiding and centering readiness after the planned firmware work and power cycle before execution.

Download N.I.N.A. review sequence · Offline validation report · Oct 20–21, 2026 results

The sequence is a review artifact only. No equipment has been connected, moved or changed, and nothing has been uploaded to the NUC.

Weather & roof safety

The current hourly forecast shows substantial cloud for much of the evening and after midnight, a clearer interval near 03:00 CDT, and increasing cloud again during the M31 and Orion windows. These are advisory opportunities, not a promise of usable exposure. Starfront roof/weather status · Forecast source: Open-Meteo.

Wait until the roof is open and the safety monitor permits capture. Use the established safety recovery; skip expired clock windows after delays. Do not assume the equipment is safe from this webpage.

Tonight’s fields

M31 remains the saved nine-panel mosaic with 20% overlap; blue outlines identify the actual F and B panels. Veil F extends south at fixed rotation, approximately 62% overlap with its central field. Survey images are framing context, not tonight’s captures.

The night at a glance

20:21 · astronomical dusk06:25 · astronomical dawn

01:10–04:20 · intentional constrained gap. Veil F is stopped just before its 30° floor. Broadband remains blocked until moonset and the filter-specific separation limits pass; a short additional margin is included. IC 1396 is below its saved 50° floor by approximately 00:11. Tonight uses the current Veil F / M31 B/F target pool plus Orion’s late production opportunity; completed Maia is not used to fill the gap.

Moon separation, filter limits & altitude

The Moon is approximately 81% illuminated at dusk and sets near 04:08 CDT. The saved LRGB separation override is 180° while it is above the horizon. Normal filter-specific checks also include lunar illumination and altitude, with separation evaluated throughout each visit. No Moon constraint is relaxed.

Veil F remains only about 45° from the Moon: Hα and SII pass, while OIII fails the default separation heuristic throughout its above-30° window. Moon-aware planning does not guarantee absence of background gradients.

Updated Moon model · October 22: Dashed thresholds now change smoothly with lunar illumination and altitude. The conservative OIII margin grows gradually from 80% to 90% illumination and fades near the horizon. Your saved broadband Moon-up hold is shown separately in the decision bands. These thresholds are observing heuristics, not a calibrated prediction of sky brightness or image quality. Historical capture schedules remain as recorded.

Per-filter goals & tonight’s contribution

Solid: measured Keep. Pale: non-rejected captures awaiting credit. Hatched: proposed tonight. Review and unmeasured counts can overlap and are not added together. Planned credit assumes accepted new frames; pending frames do not require automatic replacement. Each mosaic panel retains its own goals.

Proposed capture outline

Established connect/home, focuser-ambient cooling with abort-on-error, roof/safety handling, guiding, autofocus, meridian flips and safe shutdown are retained in the downloadable review file. A downloadable review sequence has been generated from the existing NUC template. It has not been sent to the NUC, imported into N.I.N.A., or started. JSON references, wheel positions, saved framing, counters and clock conditions passed offline checks; runtime import is unverified.

  1. Wait for roof open / safe conditions; connect, cool and prepare. Use time-based handoffs; elapsed windows are skipped.

    End science at 06:25 CDT, then perform the established safe shutdown. No dawn or evening flats are added to this science-only review plan.

    Evidence, assumptions & limitations

      Counts estimate complete cycles: Veil SII4/Hα2 (about 30 cycles), M31 L6/R2/G2/B2 (about 1 conservative full cycle per panel, then repeat to the clock deadline), Orion HDR once then deep L3/R1/G1/B1 (about 4 cycles). Estimated acquisition 5 minutes/field, filter change 1 minute, routine overhead 10%, two-second readout, and a 10-minute flip allowance where relevant. Runtime deep loops would stop by clock and could complete more or fewer frames.

      Exact review plan and progress snapshot · Moon geometry samples · Unmodified automatic planner output