18–19 OCTOBER 2026 · CDT
Veil, farther south.
Andromeda’s two outer fields.
Loaded in N.I.N.A. · idle. Kevin approved this plan. The October 18 sequence is loaded on the NUC under the Texas rig profile; the three production fields plus the Orion test block, filter positions, exposure levels and clock waits were verified. It has not been started.
A two-panel Veil mosaic
The existing central field stays intact. Panel F extends south with approximately 62% overlap; the camera keeps its current rotation. Panel F center: RA 20h52m48.1s · Dec +29°45′00″. Its separate goal matches the original field: SII 8h · Hα 4h · OIII 6h = 18h. Across both panel goals: 36h total. Existing central captures remain credited only to the central field.
Tonight begins F with approximately SII 84m, Hα 42m, OIII 63m. Goals remain open after this visit; new credit depends on frame quality. The large shared area supports matching gradients, stars and signal between panels.
Weather and roof safety
Wait for the roof and safety monitor. Late opening shortens or skips elapsed windows; preserve the fixed handoffs. The loaded sequence remains idle; capture has not been started.
Tonight’s fields
The night at a glance
All times CDT. Visits include estimated startup/acquisition, repeated filter changes, dithering, autofocus and meridian-flip time. Counts assume full windows and clear skies; they are estimates, not runtime caps.
M31 waits until moonset around 01:14CDT. F goes first; B’s higher declination leaves it eligible later. Science ends 05:35CDT, just before B descends through 30°. At05:35, acquire Orion for40 HDR saturation-test frames in L → R → G → B order. The remaining48minutes are available for this finite test, with a little extension past astronomical dawn allowed if needed. Shutdown follows completion.
Altitude, Moon & imaging windows
Compare each field with the Moon throughout the night. Bold curves and shaded windows show planned imaging; gold traces show the Moon and its angular separation.
Per-filter goals and tonight’s contribution
Solid: measured Keep. Pale: captured awaiting credit. Hatched: planned tonight. Planned Keep credit assumes accepted new frames. These are separate panel inventories.
Loaded capture outline
The working startup, cooling, roof/safety recovery, guiding, autofocus, flip/recenter and shutdown are preserved. Camera rotation remains unchanged. The Orion test follows M31 B and runs once; no flats blocks are included. Equipment remains disconnected before startup, so the focuser-temperature cooling expression cannot yet be evaluated. Cooling is configured to abort on error. Download the loaded N.I.N.A. sequence · Loaded verification.
Planning evidence and limits
Veil assessment geometric overlap 61.64%, rounded 62%; the survey footprint is approximate. The same actual focal-plane orientation is retained. M31 B/F retain their existing saved centers, 20% mosaic overlap and 12h goals each (L 6h, R/G/B 2h). Moon constraints remain unchanged.
Review plan and exact panel centers · Saved Starfront science allocations
Survey context: DSS2/CDS. Survey images are not predictions of captured signal.