Skip to content✧ STARFRONTDashboard ↗
Antique armillary sphere engraving
STARFRONT

The Night’s Observations

16–17 October 2026 │ Starfront Observatory · Texas │ CDT

CLEAR SKIES
DEEPER QUESTIONS
A BRIGHTER TOMORROW

Altitude through the night

IC 1396 50° · OTHER FIELDS 30° · CLOCK-BASED SEQUENCE
Geometric altitude · Calculated from the review-plan coordinates · CDT

Tonight’s plan · 16–17 October

Wait for the roofs to open. There is no midnight cutoff. Begin once it is dark enough and the roof/weather safety monitor reports safe.

  • IC 1396: From roof opening (no earlier than 20:26) until 00:30 CDT · repeat Ha6 / SII3 / OIII2 at 60s.
  • M31 panel B: 00:30–02:00 CDT · repeat L2 / R1 / G1 / B1 at 60s, 20% overlap.
  • M31 panel F: 02:00–03:30 CDT · the same LRGB cycle, 20% overlap.
  • Maia / Pleiades: 03:30–06:22 CDT · eight missing 5 ms L highlights, then repeat L3 / R1 / G1 / B1 at 60s. Continue through dawn beyond baseline goals.
  • Sky flats: from 06:50 CDT · 30 each L, R, G, B, Ha, OIII, SII · 210 requested.

M31 mosaic

B and F are the upper-middle and lower-middle panels in the saved 20% overlap layout. Each is a separate field; existing central-field integration does not count toward them. Approved outer-mosaic goal: 54 hours. B and F: 12h each (L 6h, R/G/B 2h each). A, C, D, E, G and H: 5h each (L 2h, R/G/B 1h each). IC 1396 uses a 50° planning floor tonight.

M31 mosaic with B above the center and F below the center, A–H clockwise

Dawn calibration

Point to altitude 75°, azimuth 285° (WNW): high sky away from the rising Sun. Tracking off; keep camera rotation and cooling. LRGB first; narrowband no earlier than 07:20. Gain 100, offset 50, 1×1; adaptive exposures up to 15 seconds target 50% mean with 10% tolerance. Each filter can retry up to 10 full searches instead of skipping after the first failure.

07:40 is the latest start for another filter set; an active SkyFlat instruction and its retries can finish later. Flat counts depend on twilight brightness and weather. This first sky-flat configuration needs validation on the rig.

Loaded in N.I.N.A. for review; not started. The revised sequence is idle. No equipment has been moved.

Download N.I.N.A. sequence →

Planning assumptions & image credits

Saved targets, fresh project progress and current NUC sequence framing were used. Approved M31 outer-panel goals were saved October 16: 54h across eight panels, excluding the existing center. Frame review decisions are unchanged. IC 1396 inventory reports derived-preview exposure-duration warnings; production totals are not certified complete.

All clock times are CDT. Calculated astronomical darkness: 20:26–06:22. Imaging starts when the roof/weather safety monitor reports safe, no earlier than astronomical dusk; there is no midnight gate. Estimated exposure totals include overhead allowances and are not captured integration.

Sky-flat limits and timing are provisional until tested on this rig. Each native SkyFlat instruction adapts exposure up to 15 seconds and retries a failed exposure search up to 10 attempts per filter; failures can result in fewer frames. A 07:40 condition bounds starting another set, not an already active instruction. The established shutdown follows flats.

Open-Meteo forecast retrieved October 16, 2026; safety decisions remain with the observatory monitor. Survey imagery: DSS2 via CDS; armillary engraving: Encyclopédie / Wikimedia Commons, public domain.