Skip to content✧ STARFRONTDashboard ↗
Antique armillary sphere engraving
STARFRONT

The Night’s Observations

12–13 October 2026 │ Starfront Observatory · Texas │ CDT

CLEAR SKIES
DEEPER QUESTIONS
A BRIGHTER TOMORROW

Altitude through the night

30° PLANNING REFERENCE · CLOCK-BASED SEQUENCE
Planned imagingFull-night path30° planning referenceTransit (peak)
Geometric altitude · Calculated from the review-plan coordinates · CDT

Tonight’s allocation

Lion and M33 acquisition remain complete. Veil and IC 1396 continue toward their saved goals; Maia gets the revised HDR stars, then continues normal LRGB nebula imaging through dawn even after baseline goals are met.

  • Veil · 20:30–23:50 CDT · ~145 min deep exposure · Ha × 1 · 60s / OIII × 3 · 60s / SII × 6 · 60s
  • IC 1396 · 23:50–03:10 CDT · ~155 min deep exposure · Ha × 3 · 60s / OIII × 2 · 60s / SII × 2 · 60s
  • Maia · 03:10–06:19 CDT · ~78 min deep exposure · L × 3 · 60s / R × 1 · 60s / G × 1 · 60s / B × 1 · 60s

Maia HDR: 30 production frames each L, G and B at 5 ms, with no pilot frames or acquisition checks. Reuse the 30 accepted R highlights at 10 ms. Gain 100, offset 50 and established framing/temperature. Normal LRGB nebula imaging follows directly through dawn.

All deep subexposures remain 60 seconds. The right-hand bars show measured Keep credit plus tonight’s estimated integration; existing Review frames remain pending credit and are not assumed rejected. HDR highlights do not earn deep integration credit.

Planned shutdown 06:19 CDT; astronomical dawn 06:19 CDT. Continue normal Maia L3/R1/G1/B1 acquisition through dawn. Extra integration above the saved goals is intentional; the deep loop has no goal-based or estimated-cycle stop. Captured time and final Keep credit remain separate.

Planning assumptions & image credits

Native October 12 planner rerun with fresh, purpose-separated NAS progress and saved goals. Maia’s visit fills the rest of the astronomical night: HDR production first, then normal 60-second L3/R1/G1/B1 nebula imaging until dawn. Integration goals remain baseline milestones, not capture stop limits. Coordinates were read from the current October 11 working sequence on the NUC. One visit per target; geometric 30° floor; clock-only handoffs.

Open-Meteo advisory, fetched 2026-10-12T18:10:26Z; forecast does not exclude capture windows.

Survey illustrations: DSS2 via CDS. Armillary engraving: Encyclopédie / Wikimedia Commons, public domain.